Pods should be indicated on the furniture layout drawing with their correct plan dimensions. Because pods require only a standard power outlet (no HVAC, no dedicated circuit), electrical coordination is limited to confirming outlet availability at each planned pod position. The 90 cm minimum door clearance (120 cm preferred) should be shown as a clearance
Contact hkofficepods.com directly for current lead time information applicable to your project region and configuration. Lead times vary by model and configuration. For project programme planning purposes, we recommend initiating pod procurement discussions at the point of design development (Stage 3 / schematic design equivalent) to ensure product availability aligns with your fit-out programme.
Acoustic pods are freestanding equipment and do not constitute fixtures or leasehold improvements under standard commercial lease definitions. They make no structural modification to the building and are removable without building reinstatement. This classification has two implications for your client: no landlord consent is typically required for installation, and no reinstatement obligation is created. Your
For NBS Specification or equivalent platform use, HIGHKA pods should be specified under a dedicated clause in the furniture or acoustic workspace section of the specification document, referencing the technical parameters from the specification data sheet above. HIGHKA’s technical team can provide product-specific data in formats compatible with your specification platform on request — contact
Always require ISO 23351-1 DS,A from a named, independently accredited laboratory from any pod supplier. DS,A figures quoted without this basis are not equivalent — they may use different measurement methods, self-tested conditions, or component-level rather than enclosure-level testing. HIGHKA’s DS,A = 29.4 dB is independently verified by SGS under ISO 23351-1, representing full-enclosure system


