For a 15-person hybrid team with an average of 3–5 in-office attendees on peak days (typical 50–60% hybrid attendance), 2–3 pods in a mixed configuration is the starting baseline: 2 × Model S or M for individual call participants, plus 1 × Model ML for cases where 2–3 in-office participants join a group call together. Monitor peak-hour utilisation for 30 days: if pods are consistently above 70% occupied during the 10:00–15:00 peak call window, add capacity. HIGHKA’s 1–4 hour assembly means the capacity decision and the capacity addition happen the same day — not on opposite sides of a 6-week construction programme.