This depends on the specific use cases the renovation was intended to address. For a typical renovation plan to create 2–3 enclosed call/focus spaces and 1–2 small meeting rooms: a deployment of 3–4 Model S/M pods (individual focus and calls) and 1–2 Model L/XL pods (small group meetings) replaces the functional output of the planned construction — at a fraction of the cost, in a fraction of the time, with full asset portability. HIGHKA’s team provides deployment configuration proposals based on your specific team size, use-case mix, and floor plan.