HIGHKA pods assemble in 2–4 hours by an internal facilities team of 2–3 people, using standard hand tools. No specialist contractors, no permits, no building modifications. The pod is operational on the day of delivery. Framery pods can be assembled in a similar timeframe, with professional installation services available. Most leading pod products require 2–4 hours for assembly by a small team.


